DataCentres Ireland 2024

Nov 11, 2024

Join Edina at DataCentres Ireland 2024

Edina is exhibiting at DataCentres Ireland 2024, from 20th - 21st November, at the RDS, Dublin.
 
Visit the Edina team at stand 452 to discuss your infrastructure requirements for hydrotreated vegetable oil (HVO) fuel standby power generation, hydrogen-enabled gas engines with optional combined power and cooling, and battery energy storage as an integrated grid-connected or microgrid configuration.

datacentre-ireland-hero-1920-2

As an EPC contractor specialising in mission-critical standby generation rated 10kVA to 3MVA, hydrogen-enabled MWM gas engines and tier 1 battery energy storage systems, Edina designs, installs and maintains on-site generation and energy storage solutions to address energy consumption, grid connectivity and climate compliance challenges.

At the Bank of Ireland, Dublin, Edina supplied, installed, and commissioned two 1,000kVA prime-rated standby generation sets within an existing plant within the bank's operations centre to ensure energy resilience and reliability.

Elsewhere, Edina has significant experience delivering energy centres with over 600MW grid-connected capacity in the UK and almost 40 years in grid interfacing projects.

To register your interest today and attend DataCentres Ireland 2024.

Contact Us

If you are looking to take control of your energy needs and produce power close to the point of use, we would love to hear about your project requirements and help power your future. If you would like to discuss your project, please contact us.

Get in touch